21st March 2018
PF Why?

PF Why?

Neil Grundon, deputy chairman of Grundon Waste Management, says it’s time to adopt a different development model to PFI, one which puts waste management companies at the heart of building a bright new future for the industry. In 2009, I … Continue reading

The post PF Why? appeared first on CIWM Journal Online.

24th April 2017
Lakeside Achieves Zero Waste To Landfill Target

Lakeside Achieves Zero Waste To Landfill Target

Lakeside, the Viridor-Grundon joint venture energy from waste facility, has announced it has achieved its zero waste to landfill target. The Viridor-Grundon joint venture at Lakeside has been fully operational since 2012. Danny Coulston, Operations Director at Lakeside at Colnbrook, … Continue reading

The post Lakeside Achieves Zero Waste To Landfill Target appeared first on CIWM Journal Online.

24th March 2017
Lakeside EfW Claims 18 Months Of Zero Waste To Landfill

Lakeside EfW Claims 18 Months Of Zero Waste To Landfill

The Lakeside Energy from Waste (EfW) facility has now achieved “zero waste to landfill” over an 18 month period, according to its operators, due to what it calls a “pioneering arrangement”. Since 1 September 2015, the Lakeside facility – a joint venture between … Continue reading

The post Lakeside EfW Claims 18 Months Of Zero Waste To Landfill appeared first on CIWM Journal Online.

ASK FOR A CALL BACK

Just leave us your contact information and one of our team will call you as soon as possible.